New Apartment Project Closest to CIQ: An In-Depth Survey
Gimsai from Jinshi Studio provides an overview of a new apartment project located close to CIQ (Customs, Immigration, and Quarantine Complex). The project, developed by Majestic, is only 450 meters from CIQ and plans to connect to the Renxing Tian Bridge via a new bridge.
Location and Surrounding Developments
Currently, Gimsai is near Majestic's Gemrise, which is 720 meters from CIQ. He also notes the Summer Suite, adjacent to the New Age Food Center, is 800 meters away. The new project site itself is currently a car park.
Project Details and Developer Information
The project is Majestic's Phase 2. The brand name, APTL, is already visible. Key information can be gleaned from the site, including the developer, architect, and main construction details, even before official details are released. The project will be 50 stories high and contain 996 units. Facilities will be located on floors 11, 49, and 50.
Construction Method and Challenges
The construction is using hydraulic compression to minimize the impact on nearby structures. This method is being used because there is an existing apartment building nearby. Standard pile driving could potentially affect its structural integrity.
Exploring the Surroundings and Accessibility
The area includes a car park, previously charging RM19. A shortcut to CIQ is available from this location. The INSTA HOTEL, previously visible in the area, has been acquired by the developer. The windows have been removed, and the building appears to be slated for demolition or integration into the project. This acquisition will likely make way for the connecting bridge.
Navigation and Alternative Routes to CIQ
-
Turning right leads to Xingshan Pass.
-
Turning left leads to press F more.
Gimsai suggests that taking the road instead of the pedestrian bridge is often faster to reach Singsang Pass. The current pedestrian bridge to Fuli is a zigzag path, making it slower than walking at street level. He will include a demonstration of this route at the end of the video. The new bridge is being built in conjunction with the RTS (Rapid Transit System) track.
Project Status and Call to Action
Majestic's Phase 2 demonstration area is currently under renovation, expected to be improved within approximately two weeks. Updated information from the developer is pending. If the location is desirable, viewers are encouraged to contact Gimsai for updates.
Travel Time to JB Central
Gimsai demonstrates the travel time to JB Central.
-
He starts at JB Central's car park, near the bus stop.
-
The journey takes approximately 5 minutes and 30 seconds.
-
He estimates the walking time to be between 6 and 6 and a half minutes, depending on pace.